Completed Projects
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, PATUAKHALI
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - CIVIL SURGEON OFFICE, SHARIATPUR
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, BAGERHAT
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, GAIBANDHA
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, KURIGRAM
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, KUSHTIA
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, NILPHAMARI
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, BANDARBAN
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, HABIGANJ
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, KHAGRACHARI
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, MOULVIBAZAR
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
PRILIMINARY ASSESSMENT REPORT - EPI BUILDING, RANGAMATI
Global alliance for vaccines and immunization (gavi) health system strengthening ii (hss-2) programme
SunEdison Solar Plant Project
Environment & Infrastructure Management Solution (EIMS) Limited, conduct Environmental & Social Impact Assessment, Soil Investigation, Hydrological Analysis and Topographic Survey for feasibility study of proposed Ground-mount Photovoltaic Solar Power Plant Project at seven different locations in Bangladesh. Area of the project locations are in total 2619 acres. The consultant conducted topographical survey and hydrological analysis to assess the risk from flood and cyclone on the proposed interventions solar power plant.
The consultants identify measures to reduced risks from flood and cyclone by raising existing embankment and improving and drainages canals. Under the same contract EIMS conducted Geo logical Survey to explore soil texture bearing capacity and sharing strength (the total bore hole is 150) etc for the seven sites. Besides EIMS produced environmental impact assessment report based on Department of Environmental (DOE) guidelines and local ecological methods of social conditions.