SERVICES WE PROVIDE
Over the years EIMS has undertaken many challenging construction projects. Our objective is to provide our client with a “we are for your safety” experience when we are awarded to execute their projects. We have completed a lot of construction projects all over Bangladesh.
Since 2011, we have been strongly committed to providing our customers with the highest level of service in construction markets. Building and maintaining relationships with our customers is at the heart of our business and we have a planning and management style that is consultative and systematic.
We believe in a proactive approach to all aspects of our business, but in particular to quality, safety, and delivery. By getting this right, we give our customers confidence and peace of mind during the process of planning, design and construction. The hands-on responsibilities and team approach of company director's in our organization with a powerful and proven synergy. We directly employ the largest and most experienced construction team and we have the ability to deliver any scale of a construction project.
Because we employ our own qualified tradesmen and apprentices we are better able to maintain high standards of quality, safety, and delivery. To support these staff we have a team of construction management professionals that includes experienced and qualified quantity surveyors, project managers, and dedicated full-time health & safety professional.
We are committed to the future of our industry and training is regularly undertaken externally and within our business activities.
For undertaking construction of any building we are considering following methods:
- New Building construction
- RCC retrofitting (footing, beam, column)
- Steel retrofitting
- URM wall retrofitting
Project management (Technical)
EIMS includes providing services to the valuable clients by our professional architects and engineers in the following areas:
- Prepare the cost estimates, phasing out and priorities activities;
- Cost control by preparing time bound work plan, checking rates and labor input planning;
- Implementation of project plan and assist in ensuring the quality of materials and services involved in the construction works;
- Implementation, supervision, monitoring and evaluation of overall construction works;
- Prepare work progress report in terms of quantity and quality of works completed;
- Valuation of work-in-progress;
- Dealings with suppliers and contractors;
Retrofitting design and construction works
- Five Factory Buildings of Youngone Group Bangladesh (CEPZ, Chittagong),
- Five Factory Buildings of Kenpark Bangladesh (Pvt.) Limited (CEPZ, Chittagong),
- One Factory Buildings of Unitex Limited (Agrabad, Chittagong),
- Two Factory Buildings of Opex and Sinha Group, (Kachpur, Dhaka),
- Three Factory Buildings of Univouge Garments Co. Limited (CEPZ, Chittagong),
- One Office Buildings of UNHCR (Gulshan-2, Dhaka)
- One Office Buildings of UNESCO (Bonani, Dhaka)
Alliance for Bangladesh Workers Safety Project: Structural Integrity Assessment
EIMS has been selected as QAF by Alliance to assess structural integrity of garment manufacturing factories in Bangladesh, which are mostly located in Dhaka, Savar, Gazipur and Chittagong. Within a short period of time EIMS has completed integrity assessment of 37 garments factories. The assessment was conducted by renowned professional engineers and academicians of the country’s top engineering universities to have the best quality output and customers satisfaction.
EIMS is also performing Detailed Engineering Assessment (DEA) of several export oriented garments buildings which have been visually inspected by many international groups such as ILO, Accord, ARUP etc. Within a short period of time EIMS has proved itself and gained trust of its customer to deliver quality product in time in the field of Structural Design& Check, building inspection and detailed engineering assessment.
Construction of Gym cum office at UNHCR Coxsbazar
Project Description:
Total objectives are to construct two storied gym cum office steel building inside the UNHCR sub office at Cox's Bazar.
Component A: Supply of the quality materials in all stage of the construction work as per scope
Component B: Project Scheduling and implement as per drawing with the proper allocation of the workers.
Component C: Handed over as per revised decision of Client including testing and commissioning of all required items.
Services:
- Task-1: Completion of foundation work including pedestal column construction.
- Task-2: Soil refilling, compaction including GB construction and anchor bolt setting for steel column foundation.
- Task 3: Total steel framing work (beam, column) deck bond slab and roofing including necessary painting.
- Task 4: Concreting of three floor including all false slab, lintel and patent stone casting at roof.
- Task 5: All the brick wall and plastering work as per drawing, curing, fire stair and door setting.
- Task 6: All electrical line installation including supply of AC, lights, fan, all required to complete the work.
- Task 7: Wall mounted and floor mounted IT network installation for 180 points and necessary equipment.
- Task 8: Total plumbing network of water supply and disposal line including supply of all necessary materials.
- Task 9: All finishing work (tiles work, painting, window setting false ceiling with wooden framing) under the scope.
VULNERIBILITY ASSESSMENT
Retrofitting Construction - Wash Extension Building
The Wash extension building of Kenpark Bangladesh (Pvt.) Limited (K-1) is located at Plot No. 31-42, Sector No. 08, CEPZ, Chittagong. The total area of the building is about 730.8 m¬2. The structural system of the building is RCC beam-column on the first & second floor and rafter with purlin in the roof. The building is constructed on a column individual foundation as per drawing and during construction, it was verified. The factory building has one stair, one fire stair, and one lift core. Shear wall in the lift core is found in the building framing system. Therefore, the building can be classified as an ordinary moment-resisting frame (OMRF). BUET technical team conducted a visual inspection of the building. Based on visual inspection, the BUET team recommended conducting a Detail Engineering Assessment of the building. So retrofitting design was prepared.
Retrofitting Construction of 3D Building
The Wash extension building of Kenpark Bangladesh (Pvt.) Limited (K-1) is located at Plot No. 31-42, Sector No. 8, CEPZ, Chittagong. The total area of the building is about 1098.68m2. The 3D building is a three (3) storied RC beam slab structure. The building is constructed on a spread footing foundation as per drawing and during construction, it was verified. Shear wall in the lift core is found in the building framing system. This building is having an Ordinary Moment Resisting Frame (OMRF). BUET technical team conducted a visual inspection of the building. Based on visual inspection, the BUET team recommended conducting a Detail Engineering Assessment of the building. After the assessment, it was found that 18 nos. of foundations, 16 nos. of grade beams, 120 nos. of columns, and 38 nos. of floor beams were inadequate. So retrofitting design was prepared.
Retrofitting Construction of WASH Steel Building
The WASH steel building of Kenpark Bangladesh (Pvt.) Limited (K-1) is located at Plot #31-42, Sector#08, CEPZ, Chittagong. The total area of the building is about 1818.0 m¬2. The structural system of the Wash steel building is a multi-gable framed structure. The factory building has one story. BUET technical team conducted a visual inspection of the building. Based on visual inspection, the BUET team recommended conducting a Detail Engineering Assessment of the building. After the assessment, it was found that 33 nos of the pedestal, 33 nos of steel column, and 28 nos of rafter were inadequate. So retrofitting design was prepared by EIMS.
Construction of Surma Garments Washing & Finishing Co. Ltd.
Surma Garments Washing and Finishing Building of Youngone Group (CEPZ) Limited is a two-storied concrete moment resisting frame structure with a mezzanine above the ground floor in two blocks of the building. This structural system is a (beam-column framing) Ordinary Moment Resisting Frame (OMRF) system. BUET technical team conducted a visual inspection of the building. Based on a visual inspection of the BUET team, it was recommended to conduct a Detail Engineering Assessment (DEA) of the building. After conducting the detailed engineering assessment some beams, columns, and foundations were found inadequate. Therefore, the retrofitting design was conducted, and the implementation of the proposed design had been done accordingly.
Retrofitting Construction of TSL Extension Building
TSL Extension Building of Youngone Group (CEPZ) Ltd is a six storied concrete moment resisting frame structure. BUET technical team conducted a visual inspection of the building. Based on a visual inspection of the BUET team, it was recommended to conduct a Detail Engineering Assessment (DEA) of the building. After conducting the detailed engineering assessment some beams, columns, and foundations were found inadequate incapacity. Therefore, the retrofitting design was conducted, and the implementation of the proposed design had been done accordingly.
Retrofitting Construction of Unreinforced Masonry Wall
The factory building of Univogue Garments Co. Limited (Unit-4, Shed-1) is a single-storied steel structure with a mezzanine floor. It is a structure having an area of about 69800 sft. approximately. As per BUET recommendation, the URM wall located at the exit way of the Quality Control Room on the ground floor of this building has to be retrofitted to avoid out-of-plane failure during an earthquake. So retrofitting design was required as per recommendation. The wall has been retrofitted to protect the out of plane failure during an earthquake.
Retrofitting Construction of Univogue Garments Co. Ltd.
The factory building of Univogue Garments Co. Limited (Unit-2) is a multiple-gable framed steel structure. It is a single-storied structure having an area of about 28,000 square feet. BUET technical team conducted a visual inspection of the building. Based on a visual inspection of the BUET team, it was recommended to conduct a Detail Engineering Assessment (DEA) of the building. After conducting the detailed engineering assessment some RCC pedestals, steel columns, and rafters were found inadequate.